    There are many ways where PLCs can communicate and talk to each other, in this article we will talk about one of these methods which is how to establish Siemens communication between PLCs using the i-device function to make PLC-to-PLC data transfer.

    What is the I-Device function?

    The I-Device function can be used to exchange data between two PLCs very easily. An I-Device is simply a PLC that is used as an IO device. That means the PLC will act as an IO module providing inputs and receiving outputs with the other PLC.

    I-device function enables PROFINET to communicate not only with subordinate devices like IO controllers, but also IO communication with other higher-level or central controllers as an IO device.

    Siemens Communication between PLCs
    Most of the S7 family PLCs support the I-Device feature but some controllers don’t depending on the firmware version for example:

    • S7-300 (from firmware version V3.2)
    • S7-1200 (from firmware version V4)

    You can simply know if your controller has the I-device feature or not by going into your PLC PROFINET interface properties and checking for the “operating mode” option. See pictures 1a and 1b.

    95-1.gif

    picture 1a. PLC doesn’t support I-device

    From the picture, we can’t see the “operating mode” option, so we know that PLC doesn’t support the I-device feature.

    95-2.gif

    Picture 1b. PLC supports the I-device feature

    As you see from the picture, this PLC supports the I-device feature.

    A PLC with the “Intelligent IO device” configuration is called an I-Device. An I-Device is like a standard IO device and needs to be handled like one. This means that the I-Device is also connected to a higher-level IO controller.

    So , an I-device will act as an IO module, but it is also still a PLC, so it still acts as a controller if you want it to.

    Data exchange concept

    The guiding principle of the I-Device method is to use the known process image in a CPU. From the higher-level IO controller’s view, communicating to an I-Device is similar to communicating to a distributed IO with the usual read and write processes at inputs and outputs.

    From the I-Device’s view, data transfer to a higher-level IO controller is also analog to the data transfer to the local or assigned distributed IO via inputs and outputs.

    I-device Configuration options

    There are two possibilities for configuration:

    • Configuring an I-Device within a project.
    • Configuring an I-Device that is used in another project

    When configuring an I-Device for another project, STEP 7 enables you to do this by exporting a configured I-Device in a GSD file. The GSD file can be imported in the other project or the other engineering system like other GSD files.

    This allows not only for communication within the project, but also communication across projects and data exchange between different manufacturers in a tried and tested way. We will show that in another article.

    In this article, we will show the Configuration of the I-device within the same Siemens PLC project.

    I-device configuration within the same PLC project

    We will assume that we have two PLCs in our project, CPU 1516-3 PN/DP which will act as the controller in this configuration, and CPU 1214C which will act as the I-device. 

    Start by adding the two PLCs into your TIA Portal project and setup a Profinet connection between them. See picture 2.

    95-3.gif

    picture 2. Setup connection between two PLCs.

    Now, we need to configure the CPU 1214C PLC as an I-device.

    You do that by going to the Profinet interface properties and from the operating mode option you click on the IO device option. See picture 3.

    95-4.gif

    picture 3. Select IO device.

    After that, you need to assign the I-device to a higher-level controller which is the CPU 1516-3 PN/DP PLC in our project.

    To do that just select that PLC from the Assigned IO controller drop-down list. See picture 4.

    95-5.gif

    picture 4. Assign the I-device to the controller.

    After that, the I-device is now connected and assigned to the controller PLC. See picture 5.

    95-6.gif

    picture 5. The I-device is assigned to the controller PLC.

    The next step is to exchange the data between the I-device and the controller with what is known as transfer areas.

    Creating a transfer area

    Transfer areas are the IO areas that are used to exchange data between the I-Device and the higher-level IO controller.

    Go to the “I-Device Communication” section. Click the first field of the “Transfer areas” column. TIA Portal will create a predefined name that you are able to change. As you can see from picture 6.

    95-7.gif

    picture 6. Create a transfer area

    Select the type of communication relationship: currently, only CD can be selected. See picture 7.

    95-8.gif

    Picture 7. Choose CD communication option.

    Once you select the CD option, a transfer area will be created and the addresses of the IO controller and I-device will be automatically created. See picture 8.

    95-9.gif

    Picture 8. Transfer area is created.

    The addresses are pre-assigned automatically, if required, you can adjust the addresses to your environment and specify the length of the transfer area to be transferred consistently.

    To create another transfer area as before, just press the “add new”, see picture 9.

    95-10.gif

    picture 9. Add new transfer area.

    As we said before, data exchange is based on the simple processing image concept, which means you always send an output and receive an input.

    Also note that the arrow you see in previous picture indicates the flow of information between the I-device and the controller. So if I send data from the controller to the I-device then the arrow will be from the controller to I-device and the address of controller will be output and address of I-device will be input and vise verse as you can see from previous picture.

    Also keep in mind that it is always better to rename your transfer areas to proper indicating names. See picture 10.

    95-11.gif

    Picture 10. Rename your transfer areas.

    Loading the PLC project

    To load the PLC project data, select both controllers one after the other in the project navigation and load the project into the respective module.

    Note that, because we don’t have actual hardware devices, we can’t simulate this feature.

    Sign in to follow this  


    User Feedback

    Create an account or sign in to leave a review

    You need to be a member in order to leave a review

    Create an account

    Sign up for a new account in our community. It's easy!

    Register a new account

    Sign in

    Already have an account? Sign in here.

    Sign In Now

    There are no reviews to display.


Apply for friendship links:WhatsApp or E-mail: admin@plchmis.com
×
×
  • Create New...